Building Our Home on the St. Lawrence (2003)

Panorama - almost done (20-Sep)
Panorama - almost done (20-Sep)
Stone on the Outside.....(25-Jul)
Stone on the Outside.....(25-Jul)
'Rock on the Inside
'Rock on the Inside
They've Started the Stone
They've Started the Stone
With Roof, Windows, some Tyvec (27-Jun)
With Roof, Windows, some Tyvec (27-Jun)
Enjoying the View (6-Jun)
Enjoying the View (6-Jun)
Every Jobsite Needs a Flag
Every Jobsite Needs a Flag
Lifting the First Roof Truss
Lifting the First Roof Truss
Walls Framed and Sheathed
Walls Framed and Sheathed
View thru the Family Room
View thru the Family Room
Basement and Floor Joists
Basement and Floor Joists
Floor Joists Ready for Decking
Floor Joists Ready for Decking
Steel Beams into Place
Steel Beams into Place
Basement Floor with Tubing for Radiant Heat
Basement Floor with Tubing for Radiant Heat
Basement Walls
Basement Walls
Filling the Wall Forms
Filling the Wall Forms
Keep the Concrete Coming
Keep the Concrete Coming
Sunset on the Forms for the Basement Walls
Sunset on the Forms for the Basement Walls
Footings (22-Apr)
Footings (22-Apr)
Forming the Frost Wall
Forming the Frost Wall
Footings
Footings
Chalk Lines to Begin Foundation
Chalk Lines to Begin Foundation
Lot Cleared
Lot Cleared
Waiting for the Snow to Melt
Waiting for the Snow to Melt
Laying the Sewer Line (26-Mar)
Laying the Sewer Line (26-Mar)
Moving On - Dec 2002
Moving On - Dec 2002
The Cabin - Summer 2001
The Cabin - Summer 2001